Two bids for the "same" kitchen remodel can differ by tens of thousands of dollars — and the gap usually isn't about who's better at construction. It's about what's actually included in the number. Here's how to actually read a bid before you sign anything.

What a Legitimate Bid Should Include

Red Flags in a Bid

Comparing Bids Apples-to-Apples

Before comparing the bottom-line numbers on two or three bids, normalize them first:

  1. Confirm each bid covers the identical scope — the same square footage, same rooms, same structural work
  2. Check whether permit fees and expediting are included or separate in each bid
  3. Compare material allowances line by line, not just the total — a lower total with a lower tile allowance isn't actually cheaper if you'd choose the same tile either way
  4. Ask each contractor for the same three professional references and actually call them

A bid that's 20% lower than the others is worth a hard second look at what's missing, not an automatic win. See our fixed-price vs. cost-plus comparison for how the pricing structure itself changes what "lower" even means.

Questions to Ask Before You Sign

Frequently Asked Questions

Why do bids from different SF contractors vary so much for the same project?

Usually because the bids don't cover the same scope, even if the headline number looks comparable. Always request a detailed, line-itemized scope before comparing price alone.

How big a deposit is reasonable for a San Francisco contractor to ask for?

California law caps the initial deposit at 10% of the contract price or $1,000, whichever is less, for most home improvement contracts. A request for more is a legal red flag.