Bathroom Remodeling · San Francisco

WATERPROOFED
RIGHT THE
FIRST TIME.

Solid Bay Construction has rebuilt SF bathrooms since 2016 — old cast-iron drain lines, uneven subfloors, and the waterproofing details that determine whether a remodel lasts ten years or leaks into the unit below in two.

10
Years
CA
Lic #1156572
1
Team, Design to Build
Find Your Scope

THREE WAYS
IT GOES

Every bathroom job runs through the same waterproofing and plumbing questions — the difference is how much of the room changes around them.

Get an Estimate
01

Refresh

New vanity, fixtures, tile, and paint within the existing layout. Plumbing stays where it is, so the work moves fast.

02

Reconfiguration

Moving the toilet, shower, or vanity means relocating drain and supply lines — and re-waterproofing the shower pan and walls from scratch.

03

Full Gut & Structural

Older SF buildings often hide subfloor rot or outdated drain lines under the tile. A full gut means addressing that before anything new goes in.

Process · At a Glance

CALL TO
FINISH.

Disclosed timeline. Sign-off at every milestone. No surprises.

01
Site Visit

Scope

We check what's under the existing tile and fixtures before committing to a scope.

02
Design

Estimate

A written estimate and scope of work, including any plumbing relocation.

03
SF DBI

Permitting

Plumbing and any structural changes are submitted before demo starts.

04
Demo to Waterproof

Build

Demo, rough-in, waterproofing, then tile and finishes — in that order, no shortcuts.

Client Voices

BATHROOMS THAT
DON'T LEAK.

★★★★★

"They handled everything — design, permits, construction. The waterproofing detail work was exactly what we needed for an older building. Incredible team."

David & Lisa R.

Noe Valley · Bathroom Remodel

Questions

FREQUENTLY
ASKED.

A bathroom remodel typically runs $35,000–$120,000 depending on scope — a refresh at the lower end, a full gut with waterproofing and plumbing relocation at the higher end.

A cosmetic refresh often doesn't require a permit. Moving plumbing, fixtures, or walls does — we handle the SF DBI submission as part of the project.

A refresh can take 2–4 weeks. A reconfiguration or full gut with waterproofing and permitting typically runs 2–4 months from design through completion.

Let's Talk Bathrooms

GET A WRITTEN
ESTIMATE.

Tell us about your current bathroom and what you'd like to change. We'll respond within one business day to schedule a site visit.