The right scope depends on whether you're changing the layout or working within it.
Get an EstimateNew cabinets, counters, backsplash, and appliances in the existing footprint. Fastest path to a finished kitchen with minimal permitting.
Moving the sink, range, or island means relocating plumbing and electrical — this is where a licensed contractor coordinating the trades matters most.
Opening a kitchen to a dining or living space often means removing a load-bearing wall — engineering, permitting, and framing before any finish work starts.
Disclosed timeline. Sign-off at every milestone. No surprises.
We look at your current layout and talk through what's realistic for the space and budget.
A written estimate and scope of work, with a layout plan if the project involves reconfiguration.
Any structural, plumbing, or electrical changes get submitted before work begins.
Sequenced so your kitchen is down for the shortest time possible.
"From the first call to the final walkthrough, the team was exceptional. Pricing and timelines clearly defined — no surprises at any stage."
Sarah M.
Pacific Heights · Kitchen Remodel
A kitchen remodel typically runs $85,000–$250,000 depending on scope — a refresh at the lower end, a full gut with structural changes at the higher end.
A cosmetic refresh often doesn't require a permit. Moving plumbing, electrical, or walls does — we handle the SF DBI submission as part of the project.
A refresh can take 3–5 weeks. A reconfiguration or full gut with permitting typically runs 3–5 months from design through completion.
Tell us about your current kitchen and what you'd like to change. We'll respond within one business day to schedule a site visit.
Phone
(415) 888-5361is@solidbayconstructionsf.com
We respond within one business day.
No obligation. Your information is never shared.